Inside a Build: Amma Manne, From Slab to Plaster

Amma Manne is a family home we are building in Koppal, in North Karnataka, not far from Hampi. This is the stage where a concrete frame starts to look like a house, and it is a good moment to explain what is happening on site and why.
Where the house stands in October 2026
The reinforced concrete frame and both floor slabs are complete. The walls are built, window grilles are fixed, and the external plaster is under way on both floors, with bamboo scaffolding wrapped around the house.

Designing for a hot, dry climate
Koppal has long, hot summers and strong sun for most of the year, so the design work is mostly about shade and air.
- Sunshades over every window. Projecting concrete hoods keep direct sun off the glass and the walls below them, and throw off the rain during the monsoon.
- Sit-outs instead of sealed rooms. The first-floor sit-out and balcony give the family shaded outdoor space for the early morning and the evening, when the heat breaks.
- Terraces towards the fort. The terraces are planned for the view, and for the cooler hours when a terrace is the most pleasant place in the house.
Why the staircase is outside
The staircase rises along the side of the house, open to the air, to the first floor and the terrace. It lets the upper floor be used on its own, for visiting family or a future rental, without passing through the rooms below, and it keeps the ground-floor plan free of a stairwell.

What we check before and during plastering
Plaster hides everything behind it, so this is the last easy moment to fix what goes inside the walls.
- Conduits and pipes. Electrical conduits, switch-box positions and plumbing lines are checked against the drawings before the walls are closed.
- Openings and levels. Door and window frames are checked for line and level, and sill heights are confirmed.
- Surface preparation. Joints between brickwork and concrete are bridged with mesh so they do not crack along the junction later.
- Curing. Fresh plaster is kept wet for several days. In this heat, plaster that dries too fast cracks.
What comes next
Once the external plaster and the compound wall are complete, the work moves inside: services, flooring, joinery and finishes. We will keep adding photos to the Amma Manne project page as the house takes shape.
For the full sequence of a home build, see House Construction Stages in India: An Owner's Checklist. If you are planning a home in North Karnataka or Goa, talk to the studio.